Wind farm Dilsen-Stokkem is ready to produce renewable energy.
13/1/16
The Storm wind farm in Dilsen-Stokkem has been operational for several days! The construction of the wind farm began in February 2015.
The wind farm has a tip height of 150 m. The 2 wind turbines produce enough green power to meet the energy needs of some 2,600 Flemish families.
Share on: