The Storm wind farm Haven Gent Fase 1 consists of three wind turbines and is located on the ArcelorMittal sites in the Ghent Seaport (province of East Flanders).
Operational
Under construction
In development
3
Number of turbines
3
3 to 6
MW
Electric power per turbine
28800
MWh
Annual energy production
8200
Households provided annually with
renewable energy
Starting year of construction
2017
Year of commissioning
Discover the individual wind farms
No items found.
Tip height:
200
metres
Rotor diameter:
122
metres
Hub height:
139
metres
240
co-op members
As a nearby resident of a Storm wind farm, you get the opportunity to become a shareholder. Wind farm
Haven Gent fase 1
counts at least
240
co-op members. Through shares in our co-operative Storm CV, each person in this group invests directly in a more sustainable society — and also shares in the profits.