%20-%20Drone%20-%20Lage%20Resolutie%20-%20Jokko%20-%20011.jpg)


Wind farmUmicore OlenWind farmUmicore Olen
Wind farm
Umicore Olen
Wind farm
Umicore Olen
Go to next section
The Storm wind farm at Umicore Olen consists of one wind turbine located on the site of Umicore (province of Antwerp).
Wind farm update
Today, the wind farm is not yet operational. A special damping system is currently being installed to minimize noise disturbance. The turbine is scheduled to restart on 22/04/2025. Calibration is expected to take four weeks, until 20/05/2025. During this period, the turbine will only operate on weekdays between 7 a.m. and 7 p.m.
Operational
Under construction
In development
1
Number of turbines
6
3 to 6
MW
Electric power per turbine
15836
MWh
Annual energy production
4524
Households provided annually with
renewable energy
2023
Starting year of construction
Year of commissioning
Discover the individual wind farms
No items found.
Tip height:
232
metres
Rotor diameter:
162
metres
Hub height:
151
metres
155
co-op members
As a nearby resident of a Storm wind farm, you get the opportunity to become a shareholder. Wind farm
Umicore Olen
counts at least
155
co-op members. Through shares in our co-operative Storm CV, each person in this group invests directly in a more sustainable society — and also shares in the profits.
Would you like to invest in this wind farm?
Want to support the energy transition and invest in a wind farm near you? Let us know!
Highlight images of
this wind farm.
No items found.
Annexes
Relevant news
All newsThere are no relevant news articles available yet.
Please return later or overview of all the news.
Please return later or overview of all the news.