Wind farmHaven Gent Fase 3bWind farmHaven Gent Fase 3b
Wind farm
Haven Gent Fase 3b
Wind farm
Haven Gent Fase 3b
Go to next section
The Storm wind farm Haven Gent Fase 3b consists of three wind turbines and is located on the ArcelorMittal sites in the Ghent Seaport (province of East Flanders).
Operational
Under construction
In development
3
Number of turbines
6
3 to 6
MW
Electric power per turbine
45000
MWh
Annual energy production
13000
Households provided annually with
renewable energy
Starting year of construction
2022
Year of commissioning
Discover the individual wind farms
No items found.
Tip height:
230
metres
Rotor diameter:
162
metres
Hub height:
159
metres
451
co-op members
As a nearby resident of a Storm wind farm, you get the opportunity to become a shareholder. Wind farm
Haven Gent Fase 3b
counts at least
451
co-op members. Through shares in our co-operative Storm CV, each person in this group invests directly in a more sustainable society — and also shares in the profits.
Highlight images of
this wind farm.
No items found.
This text only shows when the status of the the windfarm is 'in ontwikkeling'.