A team of specialists have been painting an extra red band on the wheel in recent days.

Painting job in Westerlo.

10/7/18

In the wind farm in Westerlo, a team of specialists has been working on a high-level job for the last few days. To stay in compliance with aviation regulations, an extra red line had to be painted on the blades.

Through a hatch, the team emerges from the front of the rotor. Using ropes, and plenty of safety precautions, they carefully lower themselves to the right height. After a fair bit of scrubbing and sanding, the painting can commence.

Not a job for the faint-hearted!

Share on:
No items found.
Operational
Under construction
In development

Into the wind farm
Westerlo

The Storm wind farm in Westerlo consists of two wind turbines and is located behind the DAF factory along the E313 highway (province of Antwerp).

Follow us on social media!

Ask us a question

Thanks!
Your form has been sent successfully.
We will contact you as soon as possible.
Something went wrong while submitting the form.