
Wind farm Desselgem is operational after a successful test run.
13/5/16
After a successful test run of 240 hours, the Storm wind farm in Desselgem is all set to produce plenty of green energy.
The wind farm consists of 2 wind turbines with a tip height of 150 metres. The wind farm will produce enough green power to meet the energy needs of about 2850 Flemish families.
Share on: