The Storm wind farm in Pelt consists of three wind turbines and is located north of the Bocholt-Herentals canal, on the industrial site of Nyrstar in Pelt (province of Limburg).
Operational
Under construction
In development
3
Number of turbines
4
3 to 6
MW
Electric power per turbine
27300
MWh
Annual energy production
7800
Households provided annually with
renewable energy
Starting year of construction
2021
Year of commissioning
Discover the individual wind farms
No items found.
Tip height:
170
metres
Rotor diameter:
145
metres
Hub height:
97.5
metres
151
co-op members
As a nearby resident of a Storm wind farm, you get the opportunity to become a shareholder. Wind farm
Pelt
counts at least
151
co-op members. Through shares in our co-operative Storm CV, each person in this group invests directly in a more sustainable society — and also shares in the profits.